Beaver 2300/4000 Electrics IHC

Asisto redesigned the complete electrical installation for Beaver types 2300 and 4000. For a total of 3 dredgers all equipment was delivered to Bagdad.

Control system is based on Wago PLC and touch screen

Asisto part in this project

  • Complete engineering for Beaver 2300 and Beaver 4000
  • Software based on Wago PLC and touchscreen using CoDeSys
  • Engine room cabinets
  • Pump room cabinets
  • Bridge panels
  • Generators
  • All cabling and junction boxes
  • All lights and sockets
  • Navigation lights and control panel

Images