Projects
Safeway - Seagull-
Asisto Engineering B.V. has been selected by Safeway for the development and installation of the Safeway Seagull concept.
Modular Survey Equipment
For several clients Asisto Services B.V. designed and fabricated modular concepts.
Buoy Handling System Allseas
A 35T buoy handling system installed on Audacia stinger
PLET Support Tower Heerema
Pipe Line End Termination (PLET) support tower on board of Thialf.
Pipe Handling Cranes Helix
7 cranes: 2 bead stall, 3 fire line and 2 pipe hold, 2 lifting beams.
Backhoe Dredger Boskalis
Control and instrumentation system for hydraulic excavator.
Beaver 2300/4000 Electrics IHC
Complete control system for Beaver types 2300 and 4000.